Mahabank Rooftop Solar Panel Loan scheme
PM Suryaghar : Muft Bijli Yojna
S.no | Parameter | Eligibility Conditions | Eligibility Conditions | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Purpose | Loan is provided for installation of Grid connected RTS (Roof Top Solar) upto 3 KW for residential purpose only. | Loan is provided for installation of Grid connected RTS (Roof Top Solar) (Above 3 KW to 10 KW) for residential purpose only. | |||||||||||||
| 2 | Eligibility |
| ||||||||||||||
| 3 | Annual Income Criteria:- | No Minimum Annual Income criteria. | Minimum Annual Income – Rs. 3.00 Lakh | |||||||||||||
| 4 | Minimum and Maximum Loan amount | Minimum Limit: Rs. 10,000/- Maximum Limit: Rs 2.00 Lakh | Minimum Limit: Rs. 10,000/- Maximum Limit: Rs 10.00 Lakh | |||||||||||||
| 5 | Margin | Minimum Margin – 10% of project cost. (The project cost includes Design, Supply, Installation, testing & commissioning of Grid connected Rooftop Solar Photovoltaic Systems in residential premises including maintenance). | Minimum Margin - 20% of project cost (The project cost includes Design, Supply, Installation, testing & commissioning of Grid connected Rooftop Solar Photovoltaic Systems in residential premises including maintenance). | |||||||||||||
| 6 | Age | Minimum Age of applicant: -21 Years, Maximum -70- Years (Including repayment period) | ||||||||||||||
| 7 | Subsidy | As applicable under Central Government Rooftop Solar Subsidy Programme and any state Subsidy program for Rooftop Solar. Applicant should register in National Portal for Rooftop Solar & submit the approved project details of purchasing Rooftop solar from registered/empaneled with DISCOM /MNRE.
| ||||||||||||||
| 8 | Rate of Interest | For Non Home Loan borrower & Home Loan Borrower)
Applicant having minimum CIBIL Score of 650 & above (NTC also eligible) | For Non Home Loan borrower
For Home Loan customers (Same rate as Home Loan) | |||||||||||||
| 9 | Moratorium | Upto 6 Months | ||||||||||||||
| 10 | Loan repayment period | 120 Months including moratorium | ||||||||||||||
| 11 | Processing Fees | Nil | ||||||||||||||
| 12 | Account Handling Charges (Includes Documentation, Inspection/supervision, NeSL and CIBIL charges) | Rs. 500 + 0.20 % of Loan amount Minimum Rs 500/- Maximum Rs 2500/- | ||||||||||||||
| 13 | Security | Primary Security: - Hypothecation of Asset purchased i.e. Solar Roof top plant /setup. Registration of Hypothecation charges with CERSAI shall be done. | ||||||||||||||
| 14 | Disbursement | Disbursement to be made directly to the Vendor / EPC Contractor after submission of all the required feasibility reports as mandated by MNRE. (Subsidy to be claimed by Borrower / Vendor quoting the Loan Account Number) | ||||||||||||||
| 15 | In Principal offer |
| ||||||||||||||
| 16 | Link for loan application | To apply register at https://pmsuryaghar.gov.in Click here to Apply Digitally for Loan up to 2 Lakhs https://mahadigitalloans.bankofmaharashtra.bank.in/surya/#/home After successful registration, please apply at https://www.jansamarth.in→ Renewable energy → Apply now | ||||||||||||||






..